top of page
Uebersicht - Heck.png

General view of the 3D model

Union 3d compleja.png
Union 3d compleja2.png

Joint detail at building separation

Isometrie.png

Elena Heck

Steel warehouse

Steel warehouse with a size of 32x15m, divided into 2 zones with differentiated heights of 3.5m and 7.5m.

It has two support structures that replace two columns in points where two openings were needed.

One of the complexities of this particular structure lies on the connection between buildings, where both roof and façade straps, beams, columns and stabilization elements (cross brazing) converge. All this in the separation between buildings, where in addition to all this there will be a façade enclosure, for which assembly simplicity must be guaranteed.

Project date: 2022

Software: Advance Steel

North elevation, big openings as well as support elements are visible

Diploma 21.jpg